top of page
New Groundworks Project
A raft foundation on plots 4&5 plots 1-3/6-7 hydro vibe down 6-8 meters with a ground beam 600mm wide 450deep and a single layer of mesh.
Next... attenuation tanks and drainage connections, all services in the road, then onto the landscaping.









bottom of page